Pembina Asset |
TriAxon’s Position:
- TriAxon has 28 sections of 100% working interest land (rights to base Cardium)
- Current production at ~ 850 boe/day, primarily light oil (38 API)
Plan:
- Hold production at current levels and optimize cash flow to fund capital program
- Sustain best in class Op Costs (< $19/boe)
- In CCU#3, apply horizontal well technology using multi‐stage frac'ing
- Multiple horizontal locations identified
- Pigeon Lake – resolve geology model
Pool Summary:
- Light Oil ‐high quality, long RLI, low decline, low RF, capital intensive
- Largest conventional oil pool in Canada (OOIP approx 7.8 billion bbls of light oil)
- Low recovery factor at < 16%
- Pool is producing under primary and secondary (waterflood)
- CO2EOR pilot being conducted by other area Operator
- Developed with vertical wells
Opportunity:
- Increase reserve capture and per well productivity by applying multi‐stage horizontal frac'ing technique developed in Bakken
- Small increase in Recovery Factor equals large increase in reserves

|

|
|
|