/home/operations/pembina

Operations | Pembina | Bakken
spacer

Pembina Asset


TriAxon’s Position:

  • TriAxon has 28 sections of 100% working interest  land (rights to base Cardium)
  • Current production at ~ 850 boe/day, primarily light oil (38 API)

Plan:

  • Hold production at current levels and optimize cash flow to fund capital program
  • Sustain best in class Op Costs (< $19/boe)
  • In CCU#3, apply horizontal well technology using multi‐stage frac'ing
    • Multiple horizontal locations identified
  • Pigeon Lake – resolve geology model

Pool Summary:

  • Light Oil ‐high quality, long RLI, low  decline, low RF, capital intensive
  • Largest conventional oil pool in Canada (OOIP approx 7.8 billion bbls of light oil)
  • Low recovery factor at < 16%
  • Pool is producing under primary and secondary (waterflood)
  • CO2EOR pilot being conducted by other area Operator
  • Developed with vertical wells

Opportunity:

  • Increase reserve capture and per well productivity by applying multi‐stage horizontal frac'ing technique developed in Bakken
  • Small increase in Recovery Factor equals large increase in reserves


 

 

 


 

 


TriAxon 2008 | Sitemap